Produced water trucking cost calculator

Rough estimate of your per-barrel, daily, and monthly produced water trucking spend. Use it to sanity-check quotes from water haulers or to evaluate whether a pipeline gathering option pencils out versus trucking.

Estimated result

Cost per barrel

$0.40

Loaded-miles only. Excludes demurrage, disposal fee, overhead.

Daily trucking cost

$1,010

19.2 loads / day

Monthly trucking cost

$30,288

30-day basis

Formula: loads = volume / capacity · cost/load = distance · rate · daily = loads · cost/load

Estimates only. Actual rates vary by carrier, market conditions, wait time, fuel surcharges, and producer-specific contracts. Verify with active quotes before operational or financial decisions.

Want capacity data for every SWD within range?

PermianIQ maps 40,917 active Texas SWD wells with injection volumes, estimated capacity utilization, and seismic overlay. Free to browse.

How this calculator works

Produced water trucking cost is driven by four levers: volume, haul distance, rate per loaded mile, and truck capacity. Most Permian vac trucks run 120–140 bbl capacity. Haul rates commonly land in the $3.00–$4.50 per loaded mile range as of 2026, with wide variation by market and availability.

This calculator only models the loaded-mile cost component. It does not include disposal fees (usually $0.25–$0.75 / bbl at the SWD), demurrage, fuel surcharges, producer-side pit handling, or overhead. Real contract economics should layer those in.