PAR DEVELOPMENT

Permian Basin SWD Well Operator

Well records as of Mar 21, 2026 · Injection data through Jul 2026

3

SWD Wells

1

Counties

3

In SRAs

Avg capacity

8,959

Sum of latest monthly filings (bbl)

2,986

Avg monthly injection / well (bbl)

PAR DEVELOPMENT operates 3 saltwater disposal wells across 1 county in the Permian Basin of West Texas. Capacity utilization estimates are not yet available for this operator's wells, typically because reported injection volumes have not yet been published in the H-10 annual filings. 3 wells are located inside a state-designated Seismic Response Area, where injection volume reductions, additional reporting, or shut-in orders may apply depending on local seismic activity. Combined reported monthly injection across all wells totals approximately 8,959 barrels.

Operating Counties

Wells (3)

WellCountyMax RateSRA
3EctorSRA
8EctorSRA
10EctorSRA

Search PAR DEVELOPMENT wells

View detailed injection volumes, capacity estimates, and seismic data for every SWD well.

Search Wells